Brookhaven, New York

Internal Revenue Service (IRS)

CEG Solutions delivered a $45.7M deep energy retrofit at the 542,000 SF IRS Service Center in Brookhaven, NY, modernizing mechanical, HVAC, and electrical systems to cut energy use by over 57%.

industry

Data Centers, Federal Government

location

Brookhaven, New York

Solutions

Deep Energy Retrofit, Energy & Operational Efficiency, Incentives, Performance Contracting

Annual Savings

$2.1MM

Annual Energy Savings

63,680 MMBtu, 3.7K gallons water

Achieved Deep Energy Retrofit status (40%+ energy savings) in the one or more buildings:

  • 57% overall

    energy reduction

  • Plus 70% reduction

    in electricity usage

  • And 54% reduction

    in natural gas usage

Overview

The IRS Service Center, built in the 1970s, was struggling with failing infrastructure, high utility costs, and deferred maintenance. With operations spanning call centers, training rooms, offices, and a large data center, the challenge was modernizing systems while ensuring continuous service for 3,000 employees. CEG was selected to deliver a deep energy retrofit to extend asset life, reduce energy waste, and enhance performance.

Solutions

CEG implemented a campus-wide retrofit, including replacement of failed cooling towers, decommissioning of steam boilers, and installation of modular condensing hot water boilers. The project converted 247 constant volume reheat boxes to VAV boxes, installed VFDs on AHUs, and integrated a new open-source BAS platform. Lighting was fully upgraded with LEDs and advanced controls. Additional work included asbestos abatement, UPS upgrades in the data center and 44 server closets, and extensive deferred maintenance resolution — at no cost to the client, as it was supported by $2.6MM in secured utility incentives.

Results

The project now delivers $2.1MM in verified annual cost savings, reduces energy use by 63,680 MMBtu, and cuts water consumption by 3,726 kGal. Electricity usage fell 70%, natural gas dropped 54%, and water use declined 24%. By modernizing critical infrastructure, CEG improved occupant comfort, eliminated $30k/month in temporary cooling tower rentals, and ensured long-term resilience of the IRS’s essential operations.

Project Highlights

  • $45.7MM ESPC project covering 542,000 SF facility
  • $2.1MM verified annual savings
  • 63,680 MMBtu energy savings
  • 70% reduction in electricity; 54% reduction in natural gas;
  • 24% water savings
  • $2.6MM+ in incentives & rebates secured
  • Continuous operation maintained during COVID-19

Energy Conservation
Measures

  • Cooling tower replacement
  • Steam boiler decommissioning & modular hot water boiler installation
  • Conversion of 247 constant volume reheat boxes to VAV boxes
  • Front-end BAS installation & controls integration
  • VFD installation on AHUs
  • LED retrofits with advanced lighting controls
  • UPS replacement & upgrades
  • Asbestos abatement & deferred maintenance repairs

Related Projects

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.