Idaho Springs, CO

Clear Creek Metropolitan Recreation Center

EPC and retro-commissioning project at the Clear Creek Metropolitan Recreation Center, combining solar PV, lighting, weatherization, HVAC improvements, and pump efficiency upgrades to generate over $26k in verified annual savings.

industry

Commercial, Local & State Government

location

Idaho Springs, CO

Solutions

Electrification & Carbon Reduction, Energy & Operational Efficiency, Financial Structuring, Incentives, Performance Assurance, Performance Contracting

Annual Savings

$26,623

Annual Energy Savings

238.6 MMBtu

Overview

The Clear Creek Metropolitan Recreation Center faced operational challenges following an uncommissioned expansion. Our team completed an Investment Grade Audit and implemented measures including solar PV, LED lighting upgrades, weatherization, HVAC optimization, and pump efficiency improvements to reduce utility costs, enhance comfort, and improve overall system reliability.

Solutions

We delivered a comprehensive EPC and RCx project, installing a 101.6 kW rooftop solar PV array, retrofitting pool lighting with LED fixtures, sealing envelope leaks, upgrading RTU gas furnaces, correcting economizer and sensor issues, trimming pool pump impellers, and implementing monitoring-based commissioning through SkySpark.

Results

The project exceeded its guaranteed savings, achieving $26,623 in verified annual savings. Results included 337,533 kWh in electrical reductions, improved lighting quality, more reliable HVAC systems, reduced operational issues, increased equipment longevity, and lower long-term utility costs.

Project Highlights

  • $26,623 in verified annual savings
  • 337,533 kWh electricity saved (Year 1)
  • 59.1 MMBtu total energy savings
  • 101.6 kW rooftop solar PV system
  • Enhanced lighting quality with LED retrofits
  • Reduced HVAC energy through furnace and controls improvements
  • Pump impeller trimming improving pool system efficiency
  • Ballfield rate switch saving $8,003 annually

Energy Conservation
Measures

  • LED lighting retrofits
  • Solar PV
  • Weatherization (window & door sealing)
  • Modulating gas furnace upgrades
  • Pump impeller trimming
  • RTU OAT & DSP sensor replacements
  • RTU-2 economizer correction
  • Monitoring-based commissioning (MBCx)
  • Ballfield rate switch
  • Retro-Commissioning
  • Monitoring-Based Commissioning

Related Projects

Local & State Government

San Francisco Civic Center

Local & State Government

Cheyenne County Courthouse

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.