Energy Performance Contract (EPC) project at AHEC, retrofitting 26 facilities to improve energy performance and generate substantial cost savings.
industry
Higher Education
location
Denver, Colorado
Solutions
Electrification & Carbon Reduction, Energy & Operational Efficiency, Energy Audits, Incentives, Performance Contracting
Annual Savings
$528K (projected)
Annual Energy Savings
3MM kWh, 431 gal water (projected)
Overview
Auraria Higher Education Center sought a comprehensive EPC to reduce energy and water use, upgrade infrastructure, increase sustainability, and improve operational performance across its large campus.
Solutions
Our team conducted a full Investment Grade Audit and implemented a comprehensive EPC including mechanical upgrades, lighting retrofits, controls improvements, chiller replacements, transformer upgrades, ventilation improvements, and a 327 kW-DC solar installation.
Results
The project is projected to generate over $528k in annual verified savings, improve comfort and indoor environmental quality, reduce maintenance burden, and significantly lower greenhouse gas emissions.
Project Highlights
- $28.5M EPC investment
- 26 facilities evaluated for comprehensive improvements
- Includes HVAC, BAS, chiller, lighting, envelope, and solar upgrades
Energy Conservation Measures
- HVAC replacement
- BAS upgrades
- Chiller replacements
- Transformer upgrades
- Ventilation improvements
- Interior & exterior LED lighting
- Window & door replacements
- 327 kW-DC rooftop solar PV
Related Projects
Let’s Build Together
CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.
Or call us 703-294-5600
"*" indicates required fields