Pasadena, CA

NASA Jet Propulsion Laboratory, Data Center

CEG Solutions delivered a design-build ESPC project at NASA JPL to consolidate inefficient off-site IT systems into new high-efficiency data centers. This project cut energy waste and operating costs while safeguarding mission-critical space flight operations.

industry

Data Centers, Federal Government, Higher Education, Laboratories

location

Pasadena, CA

Solutions

Electrification & Carbon Reduction, Energy & Operational Efficiency, Performance Assurance, Performance Contracting, Resiliency

Annual Savings

$2.9MM

Annual Energy Savings

12,600 MMBtu

Overview

Supporting more than 50 data center end-users, NASA JPL required new high-efficiency data centers that could meet growing IT needs without disrupting mission-critical operations. The challenge was to consolidate systems from an inefficient off-site facility, improve resiliency, and enable future scalability — all while maintaining 24/7 uptime for space flight operations.

Solutions

CEG designed and built two new facilities with near Tier-III resiliency: (1) the B230 Phase 3 Data Center, supporting 96 racks with PUE 1.25, leveraging existing infrastructure and reinforced flooring for future buildouts; and (2) the B67 Modular Data Center, a self-contained microgrid supporting 28 racks with PUE 1.26, redundant UPS, and CRAC units that use outside air economization for most of the year. Together, these upgrades consolidated IT loads, reduced energy demand, and strengthened backup capacity.

Results

The data center consolidation reduced energy use by 12,600 MMBtu annually and lowered electricity consumption by 3.7M kWh, creating $2.9M in verified annual savings. NASA also gained over $2M in annual O&M savings, improved network performance, reduced IT maintenance requirements, and expanded long-term capacity — all while advancing sustainability goals.

Project Highlights

  • $2.9M in verified annual savings
  • 12,600 MMBtu energy savings
  • 3.7M kWh electricity reduction per year
  • $2M+ in annual O&M savings
  • Achieved measured PUEs of 1.25 (B230) & 1.26 (B67)
  • 50+ end-users supported with scalable capacity
  • Redundant cooling & power for mission-critical uptime

Energy Conservation
Measures

  • Data center consolidation
  • New server racks, UPS, PDUs, backup generator, and ancillary infrastructure
  • In-rack cooling and alternate high-efficiency cooling equipment
  • Airside economization
  • Secure microgrid for resiliency

Related Projects

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600