Cheyenne Wells, Colorado

Cheyenne County Courthouse

Addressing failing HVAC, windows, lighting, and infrastructure to improve comfort, reliability, and reduce operating costs at the historic Cheyenne County Courthouse while leveraging grant funding to minimize taxpayer burden.

industry

Local & State Government

location

Cheyenne Wells, Colorado

Solutions

Building Performance Compliance, Energy & Operational Efficiency, Energy Audits, Financial Structuring, Incentives, Performance Assurance, Performance Contracting

Annual Savings

$5,566

Annual Energy Savings

749,412 kBtu

Overview

Cheyenne County partnered with our team to resolve aging infrastructure challenges at the Courthouse, including failing HVAC systems, deteriorating windows, outdated electrical distribution, and envelope deficiencies. We conducted HVAC system selection and life-cycle cost analysis, secured a DOLA grant covering ~40% of costs, and implemented solutions beginning in 2021, concluding in 2022.

Solutions

Our team provided an Investment Grade Audit and EPC implementation addressing major infrastructure needs at the Courthouse. Solutions included HVAC replacement with high-efficiency systems, new controls, LED lighting and occupancy sensors, window and door replacement, electrical upgrades, security system installation, and interior finish improvements. Grant assistance and historical society coordination were also provided.

Results

The project generated verified utility and O&M savings exceeding $5,129 annually and is projected to outperform guaranteed savings by more than $400. Upgrades improved occupant comfort, reduced operational risk, enhanced energy efficiency (up to 30% savings in key areas), and modernized the historic facility’s infrastructure.

Project Highlights

  • DOLA grant funded ~40% of project costs
  • Guaranteed savings offset ~20% of project costs
  • New HVAC system & building controls
  • As-built energy savings projected to exceed guarantee by $437 annually

Energy Conservation
Measures

  • LED lighting upgrades & occupancy sensors
  • Window & door replacement
  • Electrical system modernization including fire alarm
  • Security vestibule & new security system
  • Interior & exterior finish improvements
  • New lay-in ceilings
  • Brick re-pointing

Related Projects

Local & State Government

San Francisco Civic Center

Local & State Government

City of Downey

Row midpoint Shape Decorative svg added to bottom

Let’s Build Together

CEG Solutions helps public and private clients modernize infrastructure, achieve deep savings, and enhance energy and operational efficiency — without disrupting mission-critical operations. Let’s talk about what we can achieve together.

Or call us 703-294-5600

"*" indicates required fields

This field is for validation purposes and should be left unchanged.